Ball valve installation precautions
(1) The disassembly and decomposition operation must be carried out only after it is confirmed that the upper and downstream pipelines of the ball valve have been depressurized.(2) Non-metal parts should be removed from the cleaning agent immediately after cleaning, and should not be soaked for a long time.(3) The bolts on the flange must be tightened symmetrically, gradually and evenly during assembly.(4) The cleaning agent should be compatible with the rubber parts, plastic parts, metal parts ...
2022-09-29