Valve construction and installation points
1) The installation position, height, and direction of import and export must meet the design requirements, and the connection should be firm and tight.2) For all kinds of manual valves installed on the thermal insulation pipeline, the handle shall not be downward.3) Visual inspection must be carried out before the valve is installed, and the nameplate of the valve should comply with the current national standard "General Valve Mark" GB 12220. For valves with a working pressure greater than 1.0 ...